Beaufurn manufactures contract furniture in High Point, NC, with 25+ years of experience serving hospitality, corporate, healthcare, and institutional projects.
We speak the language of FF&E specifiers. CAL TB117-2013 compliance, FSC-certified wood, finish continuity across phases, and COM tracking are standard, not premium add-ons.
Beaufurn’s contract process is designed to give designers, procurement teams, and operators clear visibility from specification to delivery. Each stage is structured, documented, and optimized for projects that demand consistency.
| Step | Process | What Happens |
|---|---|---|
| 1 | Specification Review | Submit specs, finishes, and timeline. The contract team reviews FF&E requirements, confirms customization needs, and validates lead time feasibility. |
| 2 | Sample Coordination | Finish samples shipped for approval; COM yardage and cut instructions documented. Custom sizing mockups provided as needed. Approval locks specifications before production. |
| 3 | Production & Quality Control | U.S. manufacturing in High Point, NC ensures oversight from materials to final inspection. Teams check finish consistency, foam density, joinery, and moisture barriers. |
| 4 | Documentation & Shipping | Compliance certificates prepared. Freight coordination includes pallet planning and an optional liftgate. Phased deliveries are scheduled around construction timelines or multi-property rollouts. |
Fire ratings, weight test results, and material certifications arrive with every shipment—no follow-up requests required. CAL TB117-2013 test results, FSC/PEFC chain-of-custody certificates, GREENGUARD adhesive certifications, and TSCA Title VI compliance statements support code approvals and LEED credit submissions.
ADA compliance documentation available upon request for accessibility-focused projects.
Every piece meets or exceeds commercial furniture codes. Contract-grade foam uses 2.5 lb density per cubic foot with 45 ILD (indentation load deflection). FSC-certified hardwood frames provide structural integrity under constant commercial use. Moisture barriers protect upholstered pieces against institutional cleaning chemicals.
All seating passes CAL TB117-2013 flammability standards without flame-retardant chemicals. GREENGUARD-certified adhesives support LEED submissions. Weight test documentation and material certifications ship with every order.
Multi-phase projects require cohesive finishes regardless of the timing of the phases. Our manufacturing process maintains detailed finish specifications and batch controls. Phase 2 installations match Phase 1 exactly. All locations coordinate with one another without visual mismatches.
Finish documentation includes dye lot numbers, application methods, and reorder codes for future additions spanning years after initial installation.
Choose from 14+ standard wood finishes, including Sable, Light Walnut, Dark Walnut, and Tobacco. Metal finishes include Bronze, Gold, Steel Gray, and Black across 16+ powder coat options. COM accepted with detailed cut yardage documentation and batch tracking.
Custom sizing available for seat height, booth dimensions, table configurations, and base styles. Modifications don’t extend lead times when specified during order placement.
Beaufurn operates differently from many traditional contract furniture suppliers by combining U.S.-based manufacturing, faster customization, and tighter quality control. While legacy vendors often rely on overseas production cycles and limited modification options, Beaufurn is built for designers and procurement teams who need reliable lead times, flexible specifications, and consistent finish continuity across single-property or multi-property projects.
| Feature | Traditional Suppliers | Beaufurn |
|---|---|---|
| Manufacturing Location | Often overseas | U.S.-based (High Point, NC) |
| Lead Times | 12-20 weeks | 8-12 weeks standard |
| Finish Consistency | Variation between batches | Reliable matching across orders |
| Customization | Limited or costly | Extensive without delays |
| Upholstery Options | Narrow fabric selection | COM accepted + graded-in program |
| Fire Safety Documentation | Often incomplete | Included with every order |
| Multi-Property Coordination | Difficult to match | Guaranteed finish continuity |
| Specification Changes | Long lead times | Responsive mid-project adjustments |
Each industry brings unique compliance requirements. We understand hospitality fire codes, healthcare infection control protocols, and GSA purchasing regulations.
| Industry | What We Furnish |
|---|---|
| Hospitality | Hotels, resorts, restaurants |
| Senior Living | Independent living, assisted living, memory care |
| Corporate | Offices, conference centers, cafeterias |
| Healthcare | Patient rooms, waiting areas, nurse stations |
| Education | Student lounges, dining halls, residence halls |
| Government/GSA | Public offices, administrative buildings, training and meeting spaces |
Our High Point, NC facility maintains quality control from raw materials through final inspection. Domestic production enables faster responses to specification changes, reliable freight coordination, and direct communication throughout project timelines.
No customs delays. No overseas shipping windows. No language barriers complicating technical specifications.
Domestic production delivers finished contract furniture in 8-12 weeks for standard orders. Rush orders available for critical project deadlines. Overseas suppliers typically require 12-20 weeks before customs clearance.
Our manufacturing process guarantees finish consistency across orders placed months or years apart. Multi-property rollouts maintain visual cohesion without batch variation that plagues imported furniture.
Five-year limited warranty on seating and tables covers manufacturing defects and normal commercial use. Ten-year warranty on casegoods demonstrates confidence in construction quality and material selection.
Founded 1998, Beaufurn has supplied contract furniture for properties operated by Marriott, IHG, Hilton, senior living operators, corporate campuses, and healthcare facilities nationwide.
Standard lead times range from 8-12 weeks, depending on customization requirements and order size. Rush orders available for critical project deadlines with guaranteed delivery programs.
We can often match standard contract finishes. Submit samples for review and we’ll confirm match feasibility before production. Variations may occur due to material differences or application methods.
All orders include fire ratings, weight test results, and material certifications. CAL TB117-2013 compliance, FSC/PEFC wood certifications, GREENGUARD adhesive documentation, and ADA compliance information available upon request.
Yes. We accept customer-supplied fabrics with detailed tracking, cut yardage documentation, and quality control throughout production. COM guidelines available to ensure material compatibility.
Yes. Partial shipments and staged deliveries align with construction schedules, renovation timelines, or multi-property rollouts. We coordinate freight planning and pallet-level scheduling to meet project phases.
Our domestic manufacturing maintains detailed finish specifications and batch controls. We document finish codes for every order, ensuring Phase 2 installations match Phase 1 and future additions coordinate with original specifications.
Connect with a Beaufurn contract furniture specialist for specification review, project timeline assessment, and a customized quote. Our team coordinates finish selection, ensures compliance documentation, and delivers on schedule.

